“We were facing mist carryover problems in the Drying Tower for a long time. We discussed the problem with the Galiakotwala Technical Services (GTS) Technical team.They studied the issue and gave the solution of an advanced Demister Pad of SX Wire Mesh for Drying Tower and solved this prolonged problem permanently.”
General Manager (Auxiliary),
Century Rayon
